2013年8月16日星期五

On Completion of the cold water installation, test all piping and fitting for watertighness , make good any defect,and leave everything in perfect entire to the satisfaction of the S.O and Local Authority .

On completiuon of the cold water installation, test all piping and fitting for watertightness, make good any defect, and leave everything in perfect to the entire satisfaction of S.O and Local Authorities.

Liase with SYABAS for all submission, inspection, collection of water meter, install in position including all necessarty accessories and connection

Liase with SYABAS including all submission, inspection, collection of water meter, install in position inclduing all necessary accessories and connection

On completion, for cold water installation, test all piping and fitting for waterttightness, make good any defect and leave everything in perfect entire to the satisfaction of the S.O.

Soil and water plumbing

Excavate trench to falls, commencing from formation level, for 19mm dia pipe not exceeding 1.50m deep average 900mm deep, part return, fill and ram, deposit and spread in making up level, direct to remainder load and  cart away to contractor own dump (m)
Excav

mm wide x mm thick approved crusher run as describe laid under 19mm dia pipe, spread levelled and well compacted including haunching both sides of pipes with similar material mm high ( pipe measured separately) all as per drawing. (m)

Unplasticised P.V.C pipe and fitting to B.S> 4660 and B.S. 5255 as described

mm diameter waste pipe as described jointed and laid in trench (measured separated) (m)
mm diamter laid fixed to soffit includig approved holderbats (m)
mm diamter waste pipe fxied to soffit including approved holderbats
mm diamter vent pipe fixed to wall including approved holder bath
mm diamter waste pipe including jointing laid in trnehc
mm diamter waste pipe fixed to wall including approved holderbats
mm diamter waste pipe as descriebnd laid in trnech
mm diamter waste pipe fixed to soffit including approved hoilder bats
mm diamter anti-syphone pipe chased into brickwall and concrete.

mm approved heavy-duty U.P.V.C high invest floor trap complete with and including all necessary fitting and accessories and setting trap in concrete floor and jointing to pipe out

On completion of Sanitary Plumbing Installation, testing all piping and fitting for watertigtness, make good any defect and leave everything in perfect working order to the entire satisfaction of the S.O and Local Authorities (Item)

On completeion of the Sanitary Plumbing Installation, testing all piping fitting for watertightness, make good any defect and leaver everything in perfect working order entire to the satisfaction of the S.O .

没有评论:

发表评论